Supply and install Pre-payed smart meters "Madinaty"
Home / Projects / madinaty
Project Description
Madinaty is a city built on 8 thousand feddans, designed to provide a modern life for 600,000 inhabitants in 120,000 housing units, acting as a modern extension to New Cairo.
Supply and Install Smart Network to Integrate Prepayment Vending System For Electric and Water Smart Meters Using Advanced and Latest Electronic Technology Solutions.
The Master Station having the Advance Metering Infrastructure (AMI) system shall communicate with the new and existing prepaid metering system of Madinaty to achieve remote data reading, continuously monitor and track electric meters, automatic alarm events, improve billing and vending system, remote tariff exchange to analyze and improve load of electric networks, reduce cost of power consumption to consumers at certain selected tariff, automatic cut off power and water supply at lack of balance.
More Details
Project including designing, installing, test and commissioning start up of
- → ETP5100 Three phase four wire AMI meter (100)A,;
- → MAN3000 Prepayment Three Phase Electricity Meter
- → Water Smart Meter 100mm, 25mm and 32mm prepaid,
- → Meter Data Collection “SUPERCOMM”
- → CAT5E-FTP CABLE
Scope of Work
Project Gallery
Why working with us
Once you contact GP you will be treated as a true professional who has a need for a service that will help your operation become a better work environment, more efficient and ultimately more profitable.